M6Set up geophysical and geochemical acquisition (all regions)
M12Overview of the European and national policy context for CCUS
2022
M14Active 3D seismic survey in Paris Basin (FR) and gravity survey in Ebro Basin (ES)
M18Community Acceptance: Findings from community profiles and first local survey
M18The choice between the 2 possible sites: Onshore or Offshore in Lusitania Basin (PT) and Ebro Basin (ES). Aspects are technical and societal
M24West Macedonia (GR) 2D seismic re-processing
M24Citizen engagement strategy
2023
M35Options of CCUS scenarios and concepts for the pilot plant and well design alternatives
M36Injection strategy and storage capacity
2024
M45Final CCUS concept proposed.
M45Design of the 2nd survey on community public acceptance
M48Computing and validation of the experimental design of Risk Assessment
2025
M56Storage potential in Upper Silesia (PL) and West Macedonia (GR), including geochemical and geomechanical analysis
M58Permit Dossier ready to take FID decision and legal requirements for the storage plant
M59Pre-FEED study and Final proposal of CCUS concept
Subscribe to our Newsletter
We use Mailchimp as our marketing platform. By clicking the subscribe button, you acknowledge that your information will be gathered in line with our Privacy Policy, and transferred to Mailchimp for processing.